- Joined:
- Mar 1, 2015
- Posts:
- 34,075
- Liked Posts:
- 35,762
I've always wondered where you take dumps and now I know.Real life got in the way, but finally managed to squeeze in a few hour here and there and finished up my first ever shower remodel.
Tiling was not near as bad as I thought once I had the right tools.
Gutted all the plumbing, ripped out the green board and used cement board, waterproofed it and finally tile, fixtures, grout, and sealing...
Same set up on both sides.
I had to drop from 6 jets down to 4... they pop out with pressure and I didn't quite have enough to run all 6 jets and 2 showerheads at once and get the desired results.
eliminating the 2 jets was plenty.
Feels like an emergency decontamination booth in a biological research lab.
Gotta toss up some trim around the outside, grout the front face of the little lip up front and away I go!
View attachment 9105View attachment 9106
Nice work.